Archives

August 31, 2018

Getting Started with OSHA’s RAGAGEP – Where there is a will, there is a way.

These units are also equipped with automatic thermal actuator bleed valve that opens when internal water temperature drops below 35°F and will not close until the temperature reaches 45°F so the unit is protected against freezing. But OSHA requires that the eyewash/safety shower provide tepid water (60- 100°F). Temperature control ...

August 27, 2018

Capturing All the Impacts of Change Saves Time and Money

The engineer failed to consider that the existing condenser control program would have a negative impact on the operational safety of the condenser. It is for this reason that it is vital that we ask as many questions as possible regarding the change being considered. The logical questions to ask ...

August 22, 2018

Ask These Questions Before Selecting Your PSM/RMP Compliance Auditor

How does the consultant propose to examine the program paperwork and documentation? Do they have a checklist or a set of questions to ask? Are they asking for documentation to be supplied ahead of time? If the end user uses a cloud-based document management system, it may be possible ...

August 16, 2018

SCS Engineers Welcomes Eric Brown, DrPH, CSP, CIH as Director of Health and Safety

SCS Engineers welcomes Eric Brown to the firm’s internal Health and Safety (H&S) practice. Dr. Brown will oversee SCS’s nationwide program from their corporate headquarters in Long Beach, California. Brown brings his expertise and experience from a variety of industries to SCS. His successful design and implementation of health ...

August 8, 2018

Nationwide NH3 Refrigeration Training Sessions from SCS Engineers in 2018

SCS Engineers has updated the Operator, PSM-RMP training available in 2018. Our trainers are experienced presenters that make learning fun. We bring to the table a combined total of over 50 years of refrigeration experience in positions such as Maintenance Manager, Startup Technician, Service Technician, Plant Engineer, and Instructor. ...

August 7, 2018

SCS Engineers and WEHRLE Umwelt GmbH Announce Teaming Agreement

In the last several years, U.S. landfill owners and operators are increasingly under pressure to meet more strident water quality demands while keeping their rates low. Selecting the most effective method of treatment at a sustainable cost requires advanced landfill engineering expertise, waste management expertise, and excellent knowledge of ...

August 6, 2018

Leachate Toe Drain Systems Control Leachate Seeps Underneath the Final Cover

Landfill operators can require their engineers to design a leachate toe drain system located at the toe of the slope and connected to the leachate collection system at the bottom of the landfill before the final cover geomembrane is installed. The leachate toe drain system is the only ...

August 3, 2018

SCS Technical Bulletin: BUILD Act Summary

SCS Engineers periodically prepares Technical Bulletins to highlight items of interest to our clients and friends.  Our most recent SCS Bulletin summarizes the Brownfields BUILD Act (Brownfields Utilization, Investment, and Local Development). The BUILD Act was signed into law in March 2018, amending the Brownfields provisions of the Comprehensive ...

August 1, 2018

SCS Technical Bulletin: Final Coal Combustion Residuals (CCR) Rule Updates

SCS Engineers periodically prepares Technical Bulletins to highlight items of interest to our clients and friends.  Our most recent SCS Bulletin summarizes the amendments addressing the updates to the Final Coal Combustion Residuals (CCR) Rule that the EPA published in the Federal Register on July 30, 2018, and which ...

SCS Address

Corporate Headquarters

3900 Kilroy Airport Way Ste 100
Long Beach, CA 90806-6816

Telephone

1 (800) 767-4727
1 (562) 427-0805 | FAX
service@scsengineers.com

Required Posting