At the upcoming USWAG CCR Workshop Feb 22-23 in Arlington, VA, Steve Lamb and Floyd Cotter of SCS Engineers will present a session about the advantages and disadvantages of emerging alternative capping options, and how different regulatory agencies are viewing these options.
About this Session: Traditional final cover and capping design for coal combustion residual (CCR) surface impoundments and landfills have included compacted soil liner, geomembrane liner, drainage layer, and a vegetative soil cover. But coal-fired plants oftentimes don’t have the large volumes of soil that it takes to implement these options.
Alternative capping options have recently emerged in the industry such as exposed geomembrane liners or synthetic turf/geomembrane liner systems. Some of these alternative capping options have many advantages over their traditional counterparts. These advantages include faster installation times, minimal need for soil, improved storm water quality, and reduced maintenance and post-closure costs. For surface impoundments, alternative capping designs can also greatly reduce the amount of disturbance of the existing CCR material within the impoundment.
About Steve Lamb: Steve Lamb, PE provides SCS with over 27 years of experience in solid and hazardous waste management, environmental engineering, civil engineering, hydrology and hydraulics, landfill engineering, remedial design, and regulatory compliance. Mr. Lamb is a Vice President and director of SCS’s Charlotte, NC office.
About Floyd Cotter: Floyd Cotter specializes in solid waste management projects. His project work involves all areas of solid waste management including planning, permitting, transportation, landfill design, construction, and monitoring. Mr. Cotter is also experienced in general civil engineering, construction oversight, environmental site assessments, closure and post-closure plans, and permit and contract document preparation.