SCS Blog

January 21, 2022

Sam Rice, SCS Engineers – 2022 Waste360 40-Under-40

    Congratulations to Sam Rice and Waste360’s 40-Under-40 awardees in 2022!   Sam’s contributions help the waste industry reduce environmental and health risks. His work improves the quality of … Continue reading Sam Rice, SCS Engineers – 2022 Waste360 40-Under-40

January 17, 2022

Dissecting Elevated Temperature Landfill Mysteries

  In 2006, a Northeast Ohio landfill discovered a curious and concerning occurrence – temperatures rising inside the waste mound. In addition, the same development was found over the next … Continue reading Dissecting Elevated Temperature Landfill Mysteries

January 12, 2022

Fabricated Geomembrane Institute Discusses Leakage Rates

The Fabricated Geomembrane Institute – FGI, discusses allowable leakage rates for industry. We strive for zero leakage and it is possible – this mix of regulators and practitioners including Neil … Continue reading Fabricated Geomembrane Institute Discusses Leakage Rates

January 10, 2022

SEM at Penetrations: The 10-Day Compliance Race

  The promulgation of 40 CFR 62 Subpart OOO (EG plan), effective since June 21, 2021, impacted all MSW landfills operated under NSPS subpart WWW. One of the major changes … Continue reading SEM at Penetrations: The 10-Day Compliance Race

January 7, 2022

Hiring friendly, team oriented, people

If you thrive in a friendly, collaborative, and client-focused company, SCS Engineers is the place for you. We’re looking for field technicians to work collaboratively on our Field Services teams … Continue reading Hiring friendly, team oriented, people

SCS Address

Corporate Headquarters

SCS Engineers
3900 Kilroy Airport Way Suite 300
Long Beach, CA 90806
FAX: 1 (562) 427-0805

Contact Us

Required Posting
Send us a message
×