Natural Asbestos Tamed On Interstate Project, ENR, Jun. 2017

During the construction of Interstate 11, the builders controlled potentially deadly, naturally occurring asbestos, saved a species of desert tortoise, and used treated water from a nearby wastewater treatment plant to control airborne pollution. All of this accomplished using environmental technologies.

Download (PDF, 3.98MB)

 

 

 

 

SCS Address

Corporate Headquarters

3900 Kilroy Airport Way Ste 100
Long Beach, CA 90806-6816

Telephone

1 (800) 767-4727
1 (562) 427-0805 | FAX
service@scsengineers.com

Required Posting