SCS Engineers was retained to perform construction quality assurance (CQA) and related services for a 14-acre cell handling fly ash, bottom ash and other non-hazardous solid waste from a 900-MW pulverized coal power plant in central Texas. Consistent with the requirements of the Texas Commission on Environmental Quality, this liner system included a three-foot compacted clay liner and one-foot protective cover.
Additionally, the cell construction included a geosynthetic leachate collection system and related piping. SCS also compiled a Liner Evaluation Report, consistent with project specifications.
Related engineering services provided by SCS included the following: