Coal Mine Methane – Sihe Mine, Jincheng, China

SCS Engineers Landfill Gas International ServicesSCS Engineers has provided consulting services in support of the largest coal mine methane-fired power plant in the world, located at the Sihe Mine in Jincheng, China.

Among the services performed by SCS:

  • prepared a conceptual design review report
  • assisted in preparation of specifications for major equipment
  • participated in selection of equipment suppliers
  • provided partial construction observation
  • participated in plant performance testing