Tier 2 Industrial Storm Water Permit

June 14, 2017

In her latest article, Betsy Powers describes how industrial storm water permits are designed to protect the quality of surface waters, wetlands, and groundwater. She succinctly provides what you need to know to ensure your company complies with state and federal laws under the Tier 1 or Tier 2 General Permit for Storm Water Associated with Industrial Activity. Betsy answers these questions:

  • What Inspections Should I Be Doing?
  • What if I Notice Contamination During an Inspection?
  • What Are the Recordkeeping Requirements?
  • When Do I Need to Update My SWPPP?

Betsy also sends you to the necessary documents for Wisconsin in her article. A quick read, packed with guidance and resources.

Click to read the full article.

SCS Engineers provides these services nationwide. Contact and we’ll connect you with our professionals knowledgeable of your state requirements.

About the Author: Ms. Powers is a civil and environmental engineer with more than 16 years of consulting experience. She has consulted on diverse site development and environmental compliance projects and has helped clients work cooperatively with regulatory agencies and their constituents to successfully complete projects.

Services Offered

 

 

 

Posted by Diane Samuels at 6:01 am

September 13, 2016

For years, Wisconsin landfills have relied on compliance with the storm water (stormwater) management requirements in the Chapter NR 500 code series to achieve compliance with the NR 216 storm water standards. Effective June 15, 2016, the Wisconsin Department of Natural Resources (WDNR) changed their policy, and now requires landfills and associated non-commercial borrow sites to obtain separate industrial storm water permit coverage.

Read the SCS Engineers Technical Bulletin to determine what action you may be required to take and by what date.

  • September 19, 2016, submit a Notice of Intent (NOI) form to WDNR.
  • WDNR will review your NOI and determine if your facility can be covered under the Tier 2 Industrial Storm Water Permit.
  • January 31, 2017, submit a Storm Water Pollution Prevention Plan (SWPPP) Summary Form. This also requires preparation of a SWPPP report designed to prevent storm water discharges of pollutants to waters of the state.

If you have questions or need help filing or developing a plan, please contact:

Betsy Powers, PE

(608) 216-7347

Sherren Clark, PE, PG

(608) 216-7323

 

Posted by Diane Samuels at 6:00 am