SCS Technical Bulletin: Industrial Storm Water Permit Coverage for Wisconsin Landfills

SCS periodically prepares technical bulletins to highlight items of interest to our clients and friends. These are published on our website. This SCS Technical Bulletin addresses Industrial Storm Water Permit requirements for landfills in Wisconsin and the two upcoming important file dates:

  • September 19, 2016, submit a Notice of Intent (NOI) form to WDNR.
  • January 31, 2017, submit a Storm Water Pollution Prevention Plan (SWPPP) Summary Form. This also requires preparation of a SWPPP report designed to prevent storm water discharges of pollutants to waters of the state.

Use the icons featured at left to share this information using your email or social media. SCS Engineers welcomes the sharing of resources and respects your privacy – we do not track what is shared.

If you have any questions regarding this technical bulletin, or would like assistance filing, or preparing a SWPPP report feel free to contact your local SCS Engineers representative, listed below, or email us at .

 

Betsy Powers, PE

(608) 216-7347

Sherren Clark, PE, PG

(608) 216-7323