Archives

March 23, 2006

SCS ENERGY AWARDED TWO DESIGN/CONSTRUCT/ OPERATE GREEN POWER PROJECTS VALUED AT $14.5 MILLION

  Long Beach – SCS Energy, a division of SCS Engineers, has been awarded contracts to design, construct, and operate two 3.2 MW landfill gas-fired power plants.  The projects are located in Medford, Oregon, and Atlanta, Georgia.  Each contract calls for SCS to design and construct the projects on ...

SCS Address

Corporate Headquarters

3900 Kilroy Airport Way Ste 100
Long Beach, CA 90806-6816

Telephone

1 (800) 767-4727
1 (562) 427-0805 | FAX
service@scsengineers.com

Required Posting