August 31, 2018

Getting Started with OSHA’s RAGAGEP – Where there is a will, there is a way.

These units are also equipped with automatic thermal actuator bleed valve that opens when internal water temperature drops below 35°F and will not close until the temperature reaches 45°F so the unit is protected against freezing. But OSHA requires that the eyewash/safety shower provide tepid water (60- 100°F). Temperature control ...

August 27, 2018

Capturing All the Impacts of Change Saves Time and Money

The engineer failed to consider that the existing condenser control program would have a negative impact on the operational safety of the condenser. It is for this reason that it is vital that we ask as many questions as possible regarding the change being considered. The logical questions to ask ...

August 22, 2018

Ask These Questions Before Selecting Your PSM/RMP Compliance Auditor

How does the consultant propose to examine the program paperwork and documentation? Do they have a checklist or a set of questions to ask? Are they asking for documentation to be supplied ahead of time? If the end user uses a cloud-based document management system, it may be possible ...

August 6, 2018

Leachate Toe Drain Systems Control Leachate Seeps Underneath the Final Cover

Landfill operators can require their engineers to design a leachate toe drain system located at the toe of the slope and connected to the leachate collection system at the bottom of the landfill before the final cover geomembrane is installed. The leachate toe drain system is the only ...

August 3, 2018

SCS Technical Bulletin: BUILD Act Summary

SCS Engineers periodically prepares Technical Bulletins to highlight items of interest to our clients and friends.  Our most recent SCS Bulletin summarizes the Brownfields BUILD Act (Brownfields Utilization, Investment, and … Continue reading SCS Technical Bulletin: BUILD Act Summary

August 1, 2018

SCS Technical Bulletin: Final Coal Combustion Residuals (CCR) Rule Updates

SCS Engineers periodically prepares Technical Bulletins to highlight items of interest to our clients and friends.  Our most recent SCS Bulletin summarizes the amendments addressing the updates to the Final … Continue reading SCS Technical Bulletin: Final Coal Combustion Residuals (CCR) Rule Updates

July 30, 2018

SCS Mathematical Models – Optimize Landfill Base Grades to Increase Airspace

SCS has turned the science of geometry into mathematical models utilized to quickly evaluate base grades. Specific parameters of the currently permitted base grades are plugged in the mathematical model along with those of the alternative and the model provides quantitative values (cubic yards) of the difference between ...

July 27, 2018

SCS Engineers Joins Georgia Manufacturing Alliance

The Georgia Manufacturing Alliance (GMA), based in Lawrenceville, GA, is a professional organization founded in 2008 to support Georgia’s manufacturing community. SCS Engineers is pleased to announce the firm is … Continue reading SCS Engineers Joins Georgia Manufacturing Alliance

July 24, 2018

SCS Engineers’ Nicole Kron Encourages K-12 Students to Consider STEM Careers

SCS Young Professional, Hydrogeologist Nicole Kron, recently finished her second session of Skype a Scientist, a program in which she Skypes with classrooms and talks to kids about her work as … Continue reading SCS Engineers’ Nicole Kron Encourages K-12 Students to Consider STEM Careers

July 18, 2018

Using a remote approach to monitoring and control – saves time and money

California-based Integrated Waste is a division of the Sonoma County Department of Transportation and Public Works (TPW) that operates five closed landfills. Its cloud-based RMC system monitors liquid levels in real time across the sites and notifies operators when setpoints have been exceeded. Landfill operators and technicians can look ...

SCS Address

Corporate Headquarters

3900 Kilroy Airport Way Suite 300
Long Beach, CA 90806

Telephone

1 (800) 767-4727
1 (562) 427-0805 | FAX
Contact Us

Required Posting
Send us a message
×