How does the consultant propose to examine the program paperwork and documentation? Do they have a checklist or a set of questions to ask? Are they asking for documentation to be supplied ahead of time? If the end user uses a cloud-based document management system, it may be possible ...
Landfill operators can require their engineers to design a leachate toe drain system located at the toe of the slope and connected to the leachate collection system at the bottom of the landfill before the final cover geomembrane is installed. The leachate toe drain system is the only ...
SCS Engineers periodically prepares Technical Bulletins to highlight items of interest to our clients and friends. Our most recent SCS Bulletin summarizes the Brownfields BUILD Act (Brownfields Utilization, Investment, and … Continue reading SCS Technical Bulletin: BUILD Act Summary
SCS Engineers periodically prepares Technical Bulletins to highlight items of interest to our clients and friends. Our most recent SCS Bulletin summarizes the amendments addressing the updates to the Final … Continue reading SCS Technical Bulletin: Final Coal Combustion Residuals (CCR) Rule Updates
SCS has turned the science of geometry into mathematical models utilized to quickly evaluate base grades. Specific parameters of the currently permitted base grades are plugged in the mathematical model along with those of the alternative and the model provides quantitative values (cubic yards) of the difference between ...