These twin projects incorporate one Jenbacher 316 engine/generator at the Gude Landfill, and one Caterpillar 3520 engine/generator and one Jenbacher 316 engine/generator at the Oaks Landfill.
The total capacity of the facilities is 3.2 megawatts. SCS is undertaking this assignment on a design/construct basis, and will operate and maintain the facilities under a five-year agreement.
SCS’s services on this project have included:
- Process engineering
- Supply and installation of engine/generators and all associated electrical switchgear
- Design and installation of all other mechanical equipment and piping
- Design and installation of all electrical work
- Design and construction of all civil, structural and site work
- Design and supply of prefabricated metal building
- Design and installation of a plantwide SCADA system using SCS’s proprietary Internet-based iSCADA technology
SCS Engineers’ responsibilities:
- Environmental Permits
- Interconnection Application
- Detailed Design
- Construction QA/QC
- Construction
- Plant Startup
- Ongoing Operation
- SCADA System