The Seminole Road Landfill LFGTE facility employs two Caterpillar 3520 engine/generators. The plant has a capacity of 3.2 MW. The project began operation in October 2006.
SCS’s services toward this project included:
Process engineering
Supply and installation of engine/generators and all associated electrical switchgear
Design and installation of all other mechanical equipment and piping
Design and installation of all electrical work
Design and construction of all civil, structural and site work
Design and supply of prefabricated metal building
Design and installation of a plant-wide SCADA system, using SCS’s proprietary Internet-based iSCADA technology
SCS performed this work on a turnkey basis and is responsible for ongoing operation/ maintenance of the facility under a multi-year contract.
SCS Engineers’ responsibilities: