The American Rescue Plan Act of 2021 was signed into law on March 11, 2021. It provides funds to address health outcome disparities from pollution and the COVID–19 pandemic.
EPA is assisting under-resourced communities by quickly getting out ARP funding to leverage important programs that improve air quality, drinking water, revitalization of brownfields, diesel emissions from buses in low-income communities and communities of color. In addition, the agency is awarding its first competitive grants focusing directly on the unequal impacts the COVID-19 pandemic has had on communities of color, low-income communities, and other vulnerable populations.
Projects include training, developing citizen-science tools, pollution monitoring, and educational campaigns to enable EJ advocates such as SCS Engineers, scientists, and decision-makers to address pollution and create thriving communities.
Funding currently being distributed totals approximately $2.8 million for 14 EJ-focused projects, with more to be announced soon throughout the country. In addition to the Baltimore City grant, today’s announcement includes funding for the following projects in underserved communities:
EPA also announced for the first time how the agency would distribute the $50 million in ARP funds.
A breakdown is provided below:
The main thoroughfare in Madison, Wisconsin, leading to the state capitol, is going through a major renaissance. Once an idle brownfield, and before that an active industrial-commercial area, the entire block has now been converted to residential, commercial, and office spaces, as well as a youth art center. After extensive due diligence to assess, then successfully remediate significant adverse environmental conditions from past uses, the property’s new mixed-use buildings are open for occupancy. The community art center opens in 2021.
The block formerly housed a dairy operation, gas station, auto maintenance shops, a print shop, and a dry cleaner. These past uses and the historic fill placed on the property resulted in chlorinated solvents, petroleum, polycyclic aromatic hydrocarbons (PAHs), and heavy metal contamination.
Remediating and mitigating environmental contamination and redeveloping brownfields like this one into vibrant, revenue-generating community assets takes pooled expertise from multiple disciplines, including hydrogeology and environmental engineering.
While these projects can provide high value for communities long into the future, they are complex and require large investments up front, explains Ray Tierney, an SCS vice president. Having a team that gets a full picture of the property’s environmental condition, knows regulators’ expectations, and can identify technically sound, cost-effective remediation and mitigation approaches can translate to substantial money savings.
In this case, a solid knowledge base and vetting key details resulted in seven-digit figure savings and facilitated prized redevelopments.
“We identified the amount of soil and groundwater contamination, evaluated strategies to best address the issues, and came up with a cost estimate for remediation. Based on the estimate, along with documentation validating the scientific rationale for our recommendations, the seller reduced their price to account for the legacy environmental liabilities which the purchaser agreed to accept and address as part of the property’s redevelopment.”
SCS Engineers assessed for contamination; oversaw the management of contaminated soil and groundwater during construction according to the materials management plan; supported the client in securing grants, permits and documented compliance with the approved planning documents.
For this project, as is often true in historic urban areas, the greatest expense was dealing with widespread contamination found in the historic fill soils and with groundwater issues.
“Our client is obligated to handle contaminated materials properly. We plan and permit the proper procedures, work with contractors to facilitate the work, documenting that procedures and plans are followed while making sure they only invest what is necessary to be judicious in protecting the environment and public health,” says the SCS Project Manager and Geologist Dr. Betty Socha.
During construction, Socha’s team was onsite to assist contractors in complying with environmental plans and permits, documenting that activities were completed safely and in compliance with Wisconsin Department of Natural Resources (WDNR) expectations. The team oversaw soil removal and management during site demolition and construction of the foundation, including piles and a structural slab. This support system reduces the geotechnical requirement of the underlying soils to reuse more onsite soil safely. But knowing what soil is acceptable and orchestrating the separation of contaminated and non-contaminated materials takes specialized expertise and skill.
“During construction, we evaluate soil conditions, so contaminated soil is safely disposed of at a landfill. But landfilling large volumes of soil is a considerable expense, so it’s important to determine what is safe to be segregated as clean soils for reuse elsewhere. Knowing how to do this efficiently will minimize disposal costs and maximize the use of valued resources,” Socha says.
Getting a handle on groundwater conditions and identifying the best management strategy requires equal attention.
“This property sits on a strip of land (an Isthmus) between two large and prized lakes, with a shallow water table. We thoroughly assessed the groundwater (aka, hydrogeologic) site conditions and managed groundwater generated during construction and dewatering activities,” says Tierney.
“We documented the extent of contamination, and the WDNR confirmed our evaluation that no additional remedial groundwater treatment systems were needed. We could show the contamination was contained enough to pose no risk to municipal wells, private wells, surface water, or other sensitive environments. However, the client still needed a permit to dispose of the contaminated groundwater generated during dewatering for construction of the building foundation and underground utilities,” says Tierney.
Major brownfield redevelopment projects are involved with multistep processes. They begin with a Phase I Environmental Assessment entailing an inspection of the property and a historical review.
That’s where SCS initially identifies potential or existing environmental liabilities from contamination. Then the team confirms the presence of multiple soil and groundwater contaminants through a Phase II Assessment, involving collecting and analyzing soil and groundwater samples.
Next comes a site investigation, a robust testing program to see exactly what is going on. This is where the team further defines contamination, locations, how far it spread, and concentrations. That information lays the groundwork for developing the remedial action plan to file with the WDNR. The team then works with the redevelopment contractors to seamlessly and concurrently manage both the property’s remediation and the buildings’ construction.
In Madison, Socha, Tierney, and their team also helped the developer apply for and win a $500,000 brownfield grant from the Wisconsin Economic Development Corporation, a practice that is as much an art as a science. Additional public support for the project was also received through tax incremental financing (TIF) and the Wisconsin Housing and Economic Development Authority (WHEDA) tax credits for low‐income housing.
“We merge our technical backgrounds to show the land has the potential to be turned into a strong asset that addresses the legacy environmental contamination, promotes public health, and delivers a high-value property that pays taxes and supports important city services,” says Tierney.
It takes technical horsepower to show regulators just how you are addressing contamination. You need to show the economic development group awarding the grant that the project will create well-paid jobs and tax revenue. Equally important, it must be shown that the redevelopment helps address a community need for affordable workforce housing and additional market-based housing,” Tierney says.
Tenants have already moved into the two 11-story mixed-use buildings. In addition, The Madison Youth Arts Center (MYAC) is slated to open in early summer, with a grand opening ceremony this fall. The MYAC includes classrooms, offices, rehearsal spaces, and a 300-seat auditorium.
The final project showcases the heartbeat of this popular downtown space situated between two large lakes, with features such as a rooftop terrace, plazas with seating and green space, and soon to come are 3D urban art installations and murals that tell the story of this long-lived community.
“The redevelopment of brownfields and the creation of projects like the Lyric and the Arden align with the City of Madison’s Performance Excellence Framework Vision of Our Madison – Inclusive, Innovate, and Thriving. These types of redevelopment projects help the City act as a responsible steward of our natural, economic, and fiscal resources. While making efficient use of land and cleaning up brownfields, the City is able to provide workforce housing, job opportunities, and cultural venues, all while enhancing the City’s tax base,” says Dan Rolfs, the Community Development Project Manager for the City of Madison’s Office of Real Estate Services – Economic Development Division.
It takes a village, or in this case – a City, to revitalize an urban brownfield!
Brownfields Resources to Organize, Educate, and Implement Plans in Your Community
Join SCS on June 10 for another client webinar. Using case studies, we show you how our clients tackle common challenges using proven GIS technology to reduce expenses and run more productively.
Property Development: Time is money on development projects. Environmental engineers use GIS to more accurately pinpoint potential contamination sources, conduct site assessments, strategize remediation solutions, and see sampling results weeks faster. Infographics and dashboards show if and exactly where to continue sampling without waiting weeks or months for reports.
Landfills: Operators make diagnostic and forensic use of GIS to address maintenance tasks faster. We’ll cover modeling 3D wells and liquid level data, showing how GIS embedded dashboards and infographics pinpoint exactly where to assign staff. At the same time, supervisors monitor completed assignments seeing real-time results and what still needs attention.
Siting Solid Waste Facilities: Decision-makers use multi-criteria decision analysis incorporated into a geographic information system to account for relevant technical data, environmental, social, and economic factors during the site selection of a waste transfer station. The resulting maps and infographics are useful at public meetings too.
Partial Reprint from EPA Announcement
The U.S. Environmental Protection Agency (EPA) is announcing the selection of 151 communities to receive 154 grant awards totaling $66.5 million in Brownfields funding through its Multipurpose, Assessment, and Cleanup (MAC) Grants.
This funding will support underserved and economically disadvantaged communities across the country in assessing and cleaning up contaminated and abandoned industrial and commercial properties. Approximately 50 percent of selected recipients will be receiving EPA Brownfields Grant funding for the first time and more than 85 percent are located in or serving small communities.
The grant announcement includes:
The list of the fiscal year 2021 applicants selected for funding is available here: https://www.epa.gov/brownfields/applicants-selected-fy-2021-brownfields-multipurpose-assessment-and-cleanup-grants
Please spend some time with our experts as they help you negotiate funding, regulatory compliance, and helpful tools that will help your community prepare to remediate brownfields and other properties with a past into affordable housing, mixed communities bolstering economic development, stadiums, recreation facilities and parks, logistics centers…
SCS’s next webinar helps our clients prepare to capitalize on upcoming opportunities to redevelop contaminated properties as a result of market demands, stimulus funding, and traditional Brownfields grant programs. In this live, non-commercial presentation we’ll cover the following:
This educational, non-commercial webinar with a Q&A forum is free and open to all who want to learn more about meeting the environmental challenges these new opportunities offer. We recommend this month’s discussion for developers, contractors, municipal officials, city managers interested in using stimulus funds for local development, and advisors such as banks, insurance firms, and attorneys to private and public entities.
DATE: Thursday, April 29, 2021
TIME: 2 p.m. ET, 1 CT, Noon MT, 11 PT
You will receive a Zoom email with your link to attend. Do not share this link.
Cities like Oviedo, Fla. are investing in the cleanup of defunct brownfield sites, converting even highly contaminated properties from liabilities to assets that pump economic vitality into their communities. And municipalities are getting reimbursed for doing so. But these ambitious undertakings require the expertise of professionals with strong environmental engineering and remediation backgrounds and an understanding of federal and state regulations aimed to protect public health and the environment.
This spring, after over two years of working closely with SCS Engineers and the development team, the City of Oviedo will unveil its redevelopment project: a 3.7-acre public park with a walking and jogging trail. The loop trail will be part of a larger trail system interconnecting through the City and the Cross-Seminole trail, with the latter running throughout the county.
The walking and jogging path surrounds a pond with a dual purpose: to serve as an added feature to this peaceful retreat and part of an enhanced stormwater management system that will allow business owners to convey drainage from their properties via an underground stormwater management system. Along the park perimeter, historical displays will tell the story of the nearly century-and-a-half-old City’s past.
SCS helped the City navigate regulatory issues associated with redeveloping environmentally impacted land, ensuring safe and environmentally sound practices, and maximizing financial reimbursement through the Florida Brownfields Program.
In the 1940s, the site operated as a farm but lay idle and overgrown with vegetation decades after. When SCS came in to complete the environmental assessment, the team confirmed that years of pesticide application did leave arsenic behind in the soil.
“It appears that the pesticides were used appropriately, but with the change in land use and to meet the state’s environmental criteria, we need to address the residuals to redevelop the property as a park. It would otherwise remain as unusable land without this cleanup,” says Kirk A. Blevins, SCS senior project manager.
SCS completed site assessment activities according to Chapter 62-780 FAC, which includes additional testing to delineate the extent of arsenic-impacted soil further and evaluate groundwater conditions. Assessment activities indicated that while not impacting groundwater, the soil contained arsenic above acceptable regulatory levels. In its next step, the team designed a remedial action plan with multiple considerations for success.
“Given that the site would include both a stormwater management pond and a public park, we recommended that rather than cap the soil to reduce potential exposure, the City meet the strictest cleanup criteria. This option is the most protective of human health and the environment,” Blevins says.
The plan included removing approximately 47,000 cubic yards of arsenic-impacted soil, then placement of clean import fill for areas open to the public. Blevins and his team proposed excavating to the property boundary, and they provided technical guidance to the City contractor on how to efficiently and safely execute this undertaking. “It was important to excavate to the property boundary to assure removal of the impacted material so that the City would receive unconditional closure approval from the regulatory agency,” explains Blevins.
Concise reporting of the work is key to securing that approval, so SCS documented the excavation of impacted soil to the appropriate depths and lateral extents, managing it appropriately onsite, and transporting it to an approved landfill for disposal.
The team worked with the City’s environmental counsel to bring the site into the Florida Brownfields Program and prepared its voluntary cleanup tax credit (VCTC) applications for submission to the Florida Department of Environmental Protection (FDEP). All expenses and payment, confirming the expenditures “integral to rehabilitation,” are documented. With this validation, the City of Oviedo is getting back about half of its $1,432,000 related investment. It will receive another 25% bonus once FDEP issues a letter stating that no further action is required.
Documentation and communication with the state regulators is an ongoing process requiring a detailed review of contractor proposals, invoices, pay applications, proof of payment, and a summary of progress each year over the project’s life. “In particular, a line-item review of invoices can sometimes establish additional actions that are critical to remediation that otherwise might have been overlooked and not captured. This process is vital to maximize reimbursement,” Blevins explains.
Cost, as always, is a client priority. So, SCS and the remedial team focused on minimizing offsite disposal of the impacted soil, proposing over-excavating the pond, using the unimpacted soil as the onsite fill, and placing a portion of the impacted soil at the pond’s bottom.
“This was possible because testing indicated that the impacted soil would not leach arsenic into the pond water at a rate that would adversely affect water quality. We confirm that arsenic concentrations are below the strictest regulatory level before any soil from over-excavating the pond can be of beneficial reuse onsite. Safety of people and environmental protection always comes first,” Blevins says.
The ultimate outcome: Oviedo has a regional stormwater pond suited for potential commercial operations to use for drainage, maximizing available land for economic development, as well as a recreational park for the community and visitors.
SCS’s technical expertise was crucial to successfully remediating this site, attests Bobby Wyatt, Public Works Director at City of Oviedo, Florida.
“The team easily navigated and sped up the permitting process for the arsenic removal and provided continuing assistance with monitoring during construction. The process for completing the specific remediation/permitting was unfamiliar to City staff, and SCS provided efficient and competent assistance to get us where we needed to go.
Their experience provided a sense of confidence that we were going to be able to make the park project successful,” Wyatt says.
SCS has worked on brownfields projects and voluntary remediation across the U.S. for over 45 years. We convert once nonproductive commercial and industrial properties into revenue-generators and affordable housing.
Resources:
Brownfields and Voluntary Remediation
Somshekhar (Som) Kundral is SCS Engineer’s most recent go-getter to receive the honor of a Waste360 40 Under 40 Award. Described by his supervisor, SCS Vice President Bob Speed, as ‘humble, hungry, and smart,“ Kundral has spent no time in the slow lane.
He joined SCS as a young engineer in 2010, and quickly worked his way up, reaching a senior management position in a few years.
He now oversees multiple remediation projects, from small to multimillion-dollar jobs, taking ownership of environmental aspects of redevelopment, from remediating groundwater contamination to addressing landfill gas problems as challenges. He has come up with unique and far-reaching solutions through collaboration with his team to help clients achieve their business goals.
But before telling the story of Kundral, the senior-level engineer and project manager, let’s start with an earlier chapter.
“It’s an interesting and kind of odd story,” he recalls. “A friend asked me to drive him to a job interview as he did not have transportation. The HR person, for some reason, asked both of us to interview [having heard I was an engineer too].
“I was dumbfounded and a little nervous as I was not prepared. I had to download my resume from my yahoo ID quickly… I thought, what have I got to lose? It’s a good engineering job with a large real estate company.”
He got the job and continues to seize practically every opportunity before him, growing from each one. Today at SCS, Kundral oversees several redevelopment projects, including a 500-acre landfill conversion to a large business park, which received the American Council of Engineering-Florida and the Environmental Business Journal awards.
“The landfill had a lot of environmental and geotechnical issues, with the largest ones around groundwater contamination and stormwater management. They are typical redevelopment challenges we need to overcome, and in this case, they were on a larger scale,” he says.
As the intricate strategy evolved, Kundral, working with his project advisor, Senior Vice President Eddy Smith, called many multidiscipline group huddles. Kundral has assessed, reassessed, stopped, and restarted. And he has brought in more engineers to pump up the team’s expertise and take this project to the next level.
“We are now halfway through. And I tell you, I don’t think I should have gray hair yet, but I have some now. Still, I feel so relieved because we have the formula to make this work. “We did it by integrating the groundwater and stormwater management systems,” he says.
The integration resolves two big issues: It, of course, addresses groundwater contamination. But Kundral and the team also want to maximize areas for redevelopment, and the design supports this goal as it eliminates the need for stormwater ponds.
To him, the job is as much about open communication and teamwork as technical talent.
“At the end of the day, no matter what we do, we deal with people. I believe in staying in front of our clients, explaining what to expect when, and I continually engage with staff who support me.” With this business park conversion, as they dove deeper, they saw more intricacies. “It was important to help our client see we were not simply trying to catch up; for them to understand we had to give more time and attention to do the job as best as it can be done.”
From age 28, when he came to SCS, Kundral was keenly aware that there was potential to do plenty and wanted to take on more. “I’m just curious to see what I can get into,” he says. He began with smaller projects, each with one or two focuses. Little by little, he could connect more dots. “I could start to see the big picture and wanted to know more about how to pull the whole project together,” he says.
While he mostly oversees redevelopment projects, he has also supported industrial waste permitting and compliance reporting endeavors. He describes the latter projects as straightforward.
“I prefer the more involved brownfields projects; there is more to learn when overseeing the work. Each site is unique, with different challenges. And each time, what you discover and how you approach it is different.”
Doing the work he loves has come with tradeoffs, such as giving up kayaking and cutting back on trips to the beach—once his favorite pastimes. “They’re fun, but they are day- and night-long ventures. By the time I got home, Saturday was gone. And I needed to catch up on work emails at night and plan for the next week.”
He does find a few hours some weekends for another interest—photography—heading to the zoo or state parks with his wife, Anjana, who shares his passion for watching out for a good “Kodak moment” and capturing it.
Nevertheless, figuring out how to fix problems is still his greatest passion, further maturing from experience. When asked if he could be someone else for a day, who that would be, he thought for a while, then said: “I would love to be myself again but be able to watch as a third person and make note of the scope of improvements I have made over time. From that, perhaps I can learn even more.”
Kundral speaks of three people who helped shape him: his grandfather, father, and father-in-law.
“Growing up watching my grandfather’s resilience helped me learn how to manage hard situations.
From my father, I learned to view situations in ways to understand people better. This has helped shape my thoughts to improve my communication.
From my father-in-law, I learned the importance of humor and gained a sense of humor. This is a good thing for lightening up situations and reducing stress.”
Kundral will take on challenges because it’s part of getting to the end goal. And reaching that goal is what sparks him. He goes back to the 500-acre Florida brownfield to illustrate. “This property is being converted to a business park with great companies operating there, like Home Depot and Boeing. So, our client is creating a legacy. The project creates jobs. It brings in taxes. It improves environmental conditions. We are part of it, and that excites me.”
Kundral is in good company. These other SCS Young Professionals are past 40 Under 40 Award recipients. Like Kundral, they work diligently, solving an array of complicated solid waste challenges. SCS Engineers is very proud of our YP’s award-winning accomplishments for their clients and their contributions to their communities’ health and welfare.
Steve Linehan is a Senior Project Manager who oversees solid waste and environmental services projects from SCS’s Oklahoma City and Wichita offices. Linehan has a broad range of expertise, including solid and hazardous waste regulations, landfill design, stormwater modeling design, and remedial action plans. He holds professional engineering licenses in Kansas, Missouri, Nebraska, and Oklahoma.
Srividhya (Vidhya) Viswanathan, Vice President, is recognized for her innovative engineering plans and designs of traditional solid waste and renewable energy programs. Viswanathan, Southwest Director of Engineering, continues consolidating and integrating engineering operations to provide more streamlined and efficient services. She leads solid waste engineering operations in California, Arizona, Nevada, Utah, and New Mexico.
Solavann (Sol) Sim, a Project Director and OM&M Western Regional Manager for SCS Field Services, has expertise in all facets of landfill operations, including landfill gas and liquids management. His teams keep landfills safer and running within compliance. He is a licensed professional engineer in Alaska, Arizona, California, Colorado, Hawaii, Montana, New Mexico, Nevada, Oregon, and Utah.
David P. Hostetter, Business Manager for SCS RMC® (Remote Monitoring and Controls), works in environmental engineering and technology. He serves clients by leveraging technology to reduce business and industry environmental impacts. His environmental solutions reduce potential greenhouse gas emissions and lower environmental risk from landfills, thus protecting workers and local communities.
Thanks to South Florida’s hot real estate market and impressive growth rates, a dwindling supply of properties are available for development in the area. The Atlantic Ocean limits South Florida’s development options to the east and Florida Everglades to the west. Due to these supply limitations, developers seek to redevelop contaminated landfills, golf courses, and agricultural land. Environmental due diligence is essential to the successful redevelopment of these types of properties. Depending on the property’s size and the extent of the contamination, redeveloping contaminated properties can cost upwards of a million dollars.
Typically, developers will have to deal with contaminants like ammonia at a landfill redevelopment project, arsenic at a golf course redevelopment project, or pesticides at agricultural redevelopment projects. In some cases, remediation and assessment using the standard or “default” cleanup target level (CTL) can stop a project from proceeding. However, before abandoning the project, developers should consider the potential for establishing alternative cleanup target levels (ACTLs) for the site’s contaminants.
Several technical strategies are available to developers considering redeveloping contaminated properties to reduce overall costs and expedite the construction schedule. Costs associated with managing material above a default CTL can include disposal of contaminated material, importing clean fill, and delays to permitting and construction schedules if an environmental regulator determines your assessment is incomplete.
Understanding Default Cleanup Target Levels
Environmental regulators use a range of tools to develop default CTLs. Default CTLs can be based on complex equations that consider toxicity and exposure assumptions such as ingestion rates, body weight, age, and exposure levels. Soil properties are also considered. In some cases, human health may not even be the determining factor in calculating a default CTL. Rather, a particular contaminant’s environmental impact on the local ecosystem may be what determines its default CTL.
While default CTLs are useful tools to formulate remediation strategies on a broad range of sites, default CTL values will be overly conservative for other sites. More explicitly, some sites’ present and future use and exposure characteristics are so different from the assumptions used to calculate the default CTLs – that the default CTL does not accurately correspond to the risk associated with the proposed sites’ use. In such cases, explore the development of an alternative cleanup target level (ACTL).
Establishing Alternative Cleanup Target Levels
With the right approach, a site ACTL could provide significant cost savings while maintaining regulatory compliance. But buyers beware; choose your environmental consultant carefully. The consultant should understand the site-specific factors that affect the calculation of the ACTLs. Often, a knowledgeable consultant has a good idea of the outcome even before investing the client’s time and money pursuing the alternative.
Cost and Schedule Benefits
To illustrate cost and development time-savings, consider a simple example of arsenic-contaminated soil at a residential development. Suppose there are no other reuse options available for the contaminated material, and the material must be disposed of at a landfill. Given 100,000 cubic yards (cy) of contaminated material at a disposal cost of $60 per cy, we estimate 6 million dollars in disposal costs, not including importing clean fill. However, if the site is an age-restricted residential community, certain exposure assumptions could be modified to calculate a much higher ACTL for arsenic. The soil would no longer be regulated as contaminated, and costs associated with disposal, imported material, and soil tracking are eliminated. Soil that was considered contaminated based on the default CTL is now clean based on the ACTL.
Let us look at a more complex example. Consider the case of a site contaminated with dieldrin, a common pesticide found at golf courses and agricultural properties. A leachability ACTL recalculates the default leachability of a particular soil contaminant. A leachability ACTL uses site-specific soil chemical and physical properties, such as soil organic matter content, bulk density, and annual average soil moisture content, and determines a more realistic risk profile associated with soil that could potentially leach contaminants into the groundwater. With an ACTL above the default CTL, remediation may not be necessary, or the site may not require a deed restriction, or ongoing costs associated with monitoring of the groundwater or operation of a remediation system could be eliminated, making the completed project more attractive to potential buyers.
Summary
Developing ACTLs is a careful, thoughtful strategy that an experienced environmental consultant can propose based on the site’s unique conditions. The developer’s financial objectives and schedule and the property end-use must be carefully considered to develop a thorough redevelopment approach. The use of an ASCTL could mean the difference between a project that is financially infeasible and one that is attractive and profitable.
Learn more about remediation and brownfields redevelopment.
About the Author: Troy Schick, PE, specializes in stormwater and groundwater management and voluntary remediation of properties, including brownfields and former landfills. Troy uses his experience at SCS Engineers and education as an Environmental Engineer and Environmental Manager with field inspection, sample collection, documentation, and project management to benefit Florida communities. Troy is available for consultation at tschick@scsengineers.
EBJ presented awards earlier this month for notable solutions and response to Covid-19, in addition to new technologies and recognition of environmental firms celebrating 50+ years. The publication, EBJ Vol XXXIV No 1&2: 2021 Executive Review & 2020 EBJ Business Achievement Awards & Lifetime Achievement Awards is online here.
We thank EBJ and Grant Ferrier for getting so many influential environmental leaders into one forum. Grant is EBJ’s Editor and Founder. He and Jim Walsh had a fun exchange during the event when EBJ recognized SCS’s longevity and commitment to the environmental industry for 50 years. The presentation included a short Q&A with Grant and Jim Walsh in addition to the multiple awards presented for SCS solutions.
Marketing Specialist Dana Justice of SCS Engineers shares her favorite snack on Snacks with a Surprise while discussing Brownfields’ economic potential, the environmental impact, and the opportunity to serve communities through her support. Her work with SCS’s environmental consultants and engineers provides land remediation and Brownfields grants bringing properties with a past back to pristine condition. The redevelopment of these properties, typically with developed infrastructure already in place, provide jobs, housing, parks, and tax revenues for the surrounding community.
Learn more about the Urban Land Institutes’s Women’s Leadership Initiative or
more about Brownfield Remediation and Grants here.