Subpart OOO

May 9, 2022

Important 2022 Regulatory Announcement from SCS Engineers

The deadline for Liquids Reporting Under EPA Subpart OOO is June 21, 2022. This EPA regulation is for sites that recirculate leachate and-or dispose liquid waste, as defined in the rule.

 

(l) Liquids addition. The owner or operator of a designated facility with a design capacity equal to or greater than 2.5 million megagrams and 2.5 million cubic meters that has employed leachate recirculation or added liquids based on a Research, Development, and Demonstration permit (issued through Resource Conservation and Recovery Act (RCRA), subtitle D, part 258) within the last 10 years must submit to the Administrator, annually, following the procedure specified in paragraph (j)(2) of this section, the following information:

(1) Volume of leachate recirculated (gallons per year) and the reported basis of those estimates (records or engineering estimates).

(2) Total volume of all other liquids added (gallons per year) and the reported basis of those estimates (records or engineering estimates).

(3) Surface area (acres) over which the leachate is recirculated (or otherwise applied).

(4) Surface area (acres) over which any other liquids are applied.

(5) The total waste disposed (megagrams) in the areas with recirculated leachate and/or added liquids based on on-site records to the extent data are available, or engineering estimates and the reported basis of those estimates.

(6) The annual waste acceptance rates (megagrams per year) in the areas with recirculated leachate and/or added liquids, based on on-site records to the extent data are available, or engineering estimates.

(7) The initial report must contain items in paragraph (l)(1) through (6) of this section per year for the most recent 365 days as well as for each of the previous 10 years, to the extent historical data are available in on-site records, and the report must be submitted no later than June 21, 2022.

(8) Subsequent annual reports must contain items in paragraph (l)(1) through (6) of this section for the 365-day period following the 365-day period included in the previous annual report, and the report must be submitted no later than 365 days after the date the previous report was submitted.

(9) Landfills in the closed landfill subcategory are exempt from reporting requirements contained in paragraphs (l)(1) through (7) of this section.

(10) Landfills may cease annual reporting of items in paragraphs (l)(1) through (6) of this section once they have submitted the closure report in § 62.16724(f).

 

If you need assitance meeting the regulations, please contact your project manager or send a request to  

 

 

 

Posted by Diane Samuels at 6:00 am

May 21, 2021

landfill emissions

(40 CFR Part 60, Subpart OOO)

On May 21, 2021, EPA published the final MSW Landfills Federal Plan, which implements the 2016 Emission Guidelines (EG Subpart Cf) under 40 CFR Part 62 Subpart OOO.  The Federal Plan becomes effective June 21, 2021, and impacts landfills that have not triggered NSPS Subpart XXX requirements and landfills located in states and Indian country without EPA-approved EG Cf rules.

Affected are MSW landfills that commenced construction on or before July 17, 2014, and have not been modified or reconstructed since July 17, 2014.

The Federal Plan requires existing landfills that reach an annual emissions threshold of 34 metric tons of nonmethane organic compounds (NMOC) or more to install a system to collect and control landfill gas (GCCS).  It also implements various emission limits, compliance schedules, testing, monitoring, reporting and recordkeeping requirements for GCCSs established in the 2016 Emission Guidelines for MSW Landfills.

The Federal Plan also establishes a definition for “legacy controlled landfills.”  These are landfills that have previously satisfied the requirement to submit an initial design capacity report, initial (or annual) NMOC emission rate reports, and collection and control system design plan under 40 CFR part 60, subpart WWW; 40 CFR part 62, subpart GGG; or a state/tribal plan implementing 40 CFR part 60, subpart Cc.

If you are subject to the Federal Plan and are not a “legacy controlled landfill,” you must submit a design capacity report by September 20, 2021.  And if the design capacity report indicates a capacity equal to or greater than 2.5 million Mg and 2.5 million m3 of solid waste, you must also submit an initial NMOC emission rate report within 90 days after the effective date of the Federal Plan (September 20, 2021).

SCS is working to develop a Technical Bulletin for distribution to our mailing list and on social media. The Bulletin will consolidate the Final Rule into several pages highlighting significant dates and key impacts for you.

 

 

 

 

 

 

Posted by Diane Samuels at 3:17 pm