Landfill Gas and LFGE – Dry Creek Project, Oregon Environmental Industries, Eagle Point, Oregon
The Dry Creek Landfill LFG-to-Energy (LFGE) project employs two Caterpillar 3520 engine-generators. The plant has a capacity of 3.2 megawatts. The plant began operation in September 2007.

The range of services provided by SCS on this project include:
-
Process engineering
-
Supply and installation of engine/generators and all associated electrical switchgear
-
Design and installation of all other mechanical equipment and piping
-
Design and installation of all electrical work
-
Design and construction of all civil, structural and site work
-
Design and supply of prefabricated metal building
-
Design and installation of a plantwide SCADA system using SCS’s proprietary Internet-based iSCADA technology
SCS performed this work on a turnkey basis and is responsible for operation and maintenance of the facility under a multi-year contract.
SCS Engineers’ responsibilities:
- Interconnection Application
- Detailed Design
- Equipment Procurement
- Construction QA/QC
- Construction
- Plant Startup
- Ongoing Operation
- SCADA System