SCS Blog
September 5, 2017
SCS Advice From the Field: Landfill Odor Control Using Temporary Pin Wells
Pin wells may be installed at the top surface of a new waste lift until the next lift is placed. When the time comes to cover the previous lift with a new lift, the temporary pin wells are removed, and waste is pushed over. New temporary pin wells go ...
September 1, 2017
Wishing you a safe and happy Labor Day!
With hard work comes great satisfaction. Enjoy your Labor Day weekend.
August 28, 2017
SCS Advice From the Field: Prevent Sump Clogs as Part of Regular Leachate Collection Pipe Maintenance
A drawback of jet cleaning is that when the pipes are cleaned, the spent jetting liquids enter the sump medium, thereby using essential leachate storage space in the sump.
August 25, 2017
United Way’s Seasons of Caring Community Kickoff in Madison, WI
The local SCS Engineers staff participated in United Way’s Seasons of Caring Community Kickoff. It was a “power hour” of volunteering at the Mallards Duck Pond. The event brought together … Continue reading United Way’s Seasons of Caring Community Kickoff in Madison, WI
August 21, 2017
Is the Perimeter Berm a Better Location for Gas Headers and Condensate Sumps?
The primary role of gas collection system laterals is conveying landfill gas to the final destination in the system; however, lateral pipes are also used to convey condensate in the system to a collection point such as a condensate sump. Between the gas collection laterals and the condensate sump, ...