Archives

January 5, 2021

Remediation: Landfill to Business Park and Public Area

2021 American Council of Engineering Companies of Florida, ACEC-FL Engineering Excellence Award Winner Countyline Corporate Park Background Countyline Corporate Park is a planned 8.5 million square foot, 500-acre premier logistics center built by one of Florida’s leading industrial developers. Most of the project site was a former Construction and ...

August 25, 2020

Solar Energy: Closed Landfill Solar Power Generating Station, Hanwha QCELLS USA

Rock River Generating Station, Beloit, Wisconsin Background After the closure of the coal ash landfill at the Rock River Generating Station, SCS Engineers (SCS) assists the owner of the solar power photovoltaic (PV) system with PV system design and site development of the landfill final cover. The design and ...

December 5, 2019

Remediation: Testing, Permitting, Treatment, and Disposal of Impacted Soil, Manchester Financial Group

Manchester Pacific Gateway Project, San Diego California The Manchester Pacific Gateway project comprises 15.89 acres of waterfront land owned by the Navy, which the Manchester Financial Group is redeveloping into multiple high-rise buildings, including a new Navy headquarters, office, hotel, and retail, as well as park uses as well ...

January 22, 2019

Remediation: Sole Mia in Miami, FL – Remediation System and Water Protection During Development

Sole′ Mia, Oleta Partners, LLC Biscayne Landing in North Miami (the former site of the Munisport Landfill) Background Sole′ Mia is a 200-acre, $1 billion mixed-use development on the last undeveloped property of its size abutting Biscayne Bay in South Florida. The site was formerly the Munisport Landfill, a ...

October 4, 2018

Due Diligence Assessment, Remediation, Brownfields Site Closure

Tampa, Florida FCI Residential Eleven retained SCS Engineers to conduct due diligence for their prospective purchase of the former Amazon Hose and Rubber Company’s warehouse and two adjoining properties, located in Tampa’s up-and-coming Channelside district. FCI was interested in determining the extent of environmental impacts, in order to safely develop ...

October 4, 2018

Limited Phase II Environmental Site Assessments

St. Petersburg, Florida During a Phase I ESA investigation for a large commercial real estate developer, SCS discovered recognized environmental conditions (RECs) in association with past site uses and surrounding property uses. SCS recommended a Limited Phase II ESA to determine if the site’s groundwater had been affected by ...