SCS Engineers

June 23, 2021

quality consulting engineers
A portion of the SCS Tracer Environmental team at a RETA conference. Close teamwork and quality are essential.

 

The purpose of SCS’s internal Quality Management System (QMS) is to provide our clients quality solutions ethically. With that goal in mind, SCS Tracer Environmental (a specialty practice at SCS Engineers) has developed numerous internal systems to provide quality consulting services.

For example:

  • We use an internal project checklist to ensure we consistently deliver quality reports and safety programs.
  • Our cross-training allows our team to provide a wide range of OSHA’s Process Safety Management and EPA’s Risk Management Plan-related services.

To help our clients stay in compliance, Tracer developed another quality-related system to track recurring compliance due dates for our nearly 400 clients. Our due date tracking system allows us to generate reminders for them before their actual need.

Tracer’s system of quality programs has evolved; however, the key component of providing quality solutions remains unchanged – teamwork. Without teamwork, no quality system will create success. This collaborative effort within Tracer and other practices at SCS Engineers helps us achieve our common goal of delivering quality solutions.

Sometimes that means we need to step up and help a colleague on a project with a quick turnaround time. Or, if the unexpected happens, a new project manager may need to jump in – sometimes mid-project. We take the initiative to respond to all client emails if we know the client manager is unavailable. We form internal committees to revise procedures, checklists, and templates, always intending to improve efficiency and increase quality.

Merriam-Webster defines teamwork as “Work done by several associates with each doing a part but all subordinating personal prominence to the efficiency of the whole.” With mutual trust and respect, and the free exchange of knowledge in a collaborative environment, we continue to deliver quality through teamwork.

 

We thank our SCS Quality Management Gurus, who are always helping us find better ways to deliver excellence!

 

 

 

 

 

Posted by Diane Samuels at 6:00 am

June 16, 2021

environmental engineers

 

After answering, we often hear this… That’s cool; I didn’t know that!

 

Here at SCS, we work for developers, industry, and manufacturers to help them run cleaner, safer, and more efficiently. This PBS video provides insight into how SCS brings value to the waste industry, our clients, and, most importantly, our communities.

  • Reduce waste
  • Turn waste into energy
  • Protect and clean the air, soil, and water

You may ask yourself, don’t pig farms create pollution? Yes, but even that waste is reusable!

Did you know the food you buy in the grocery is supported by our environmental experts? Learn more about SCS’s environmental engineers and consultants who bring contaminated properties back to life, lower and capture greenhouse gases for fuels and renewable energy, and make possible a brighter future.

If you are interested in becoming an SCS Engineers employee-owner, watch our comprehensive video to see the breadth of services our teams offer.

 

 

 

 

 

 

 

 

 

 

Posted by Diane Samuels at 6:00 am

June 14, 2021

brownfield redevelopment company wisconsin
While making efficient use of land and cleaning up brownfields, Madison, Wisconsin, can provide workforce housing, job opportunities, and cultural venues, all while enhancing the City’s tax base.

 

The main thoroughfare in Madison, Wisconsin, leading to the state capitol, is going through a major renaissance. Once an idle brownfield, and before that an active industrial-commercial area, the entire block has now been converted to residential, commercial, and office spaces, as well as a youth art center. After extensive due diligence to assess, then successfully remediate significant adverse environmental conditions from past uses, the property’s new mixed-use buildings are open for occupancy. The community art center opens in 2021.

The block formerly housed a dairy operation, gas station, auto maintenance shops, a print shop, and a dry cleaner. These past uses and the historic fill placed on the property resulted in chlorinated solvents, petroleum, polycyclic aromatic hydrocarbons (PAHs), and heavy metal contamination.

Remediating and mitigating environmental contamination and redeveloping brownfields like this one into vibrant, revenue-generating community assets takes pooled expertise from multiple disciplines, including hydrogeology and environmental engineering.

While these projects can provide high value for communities long into the future, they are complex and require large investments up front, explains Ray Tierney, an SCS vice president. Having a team that gets a full picture of the property’s environmental condition, knows regulators’ expectations, and can identify technically sound, cost-effective remediation and mitigation approaches can translate to substantial money savings.

In this case, a solid knowledge base and vetting key details resulted in seven-digit figure savings and facilitated prized redevelopments.

“We identified the amount of soil and groundwater contamination, evaluated strategies to best address the issues, and came up with a cost estimate for remediation. Based on the estimate, along with documentation validating the scientific rationale for our recommendations, the seller reduced their price to account for the legacy environmental liabilities which the purchaser agreed to accept and address as part of the property’s redevelopment.”

SCS Engineers assessed for contamination; oversaw the management of contaminated soil and groundwater during construction according to the materials management plan; supported the client in securing grants, permits and documented compliance with the approved planning documents.

For this project, as is often true in historic urban areas, the greatest expense was dealing with widespread contamination found in the historic fill soils and with groundwater issues.

“Our client is obligated to handle contaminated materials properly. We plan and permit the proper procedures, work with contractors to facilitate the work, documenting that procedures and plans are followed while making sure they only invest what is necessary to be judicious in protecting the environment and public health,” says the SCS Project Manager and Geologist Dr. Betty Socha.

During construction, Socha’s team was onsite to assist contractors in complying with environmental plans and permits, documenting that activities were completed safely and in compliance with Wisconsin Department of Natural Resources (WDNR) expectations. The team oversaw soil removal and management during site demolition and construction of the foundation, including piles and a structural slab. This support system reduces the geotechnical requirement of the underlying soils to reuse more onsite soil safely. But knowing what soil is acceptable and orchestrating the separation of contaminated and non-contaminated materials takes specialized expertise and skill.

“During construction, we evaluate soil conditions, so contaminated soil is safely disposed of at a landfill. But landfilling large volumes of soil is a considerable expense, so it’s important to determine what is safe to be segregated as clean soils for reuse elsewhere. Knowing how to do this efficiently will minimize disposal costs and maximize the use of valued resources,” Socha says.

Getting a handle on groundwater conditions and identifying the best management strategy requires equal attention.

“This property sits on a strip of land (an Isthmus) between two large and prized lakes, with a shallow water table. We thoroughly assessed the groundwater (aka, hydrogeologic) site conditions and managed groundwater generated during construction and dewatering activities,” says Tierney.

“We documented the extent of contamination, and the WDNR confirmed our evaluation that no additional remedial groundwater treatment systems were needed. We could show the contamination was contained enough to pose no risk to municipal wells, private wells, surface water, or other sensitive environments. However, the client still needed a permit to dispose of the contaminated groundwater generated during dewatering for construction of the building foundation and underground utilities,” says Tierney.

Major brownfield redevelopment projects are involved with multistep processes. They begin with a Phase I Environmental Assessment entailing an inspection of the property and a historical review.

That’s where SCS initially identifies potential or existing environmental liabilities from contamination. Then the team confirms the presence of multiple soil and groundwater contaminants through a Phase II Assessment, involving collecting and analyzing soil and groundwater samples.

Next comes a site investigation, a robust testing program to see exactly what is going on. This is where the team further defines contamination, locations, how far it spread, and concentrations. That information lays the groundwork for developing the remedial action plan to file with the WDNR. The team then works with the redevelopment contractors to seamlessly and concurrently manage both the property’s remediation and the buildings’ construction.

In Madison, Socha, Tierney, and their team also helped the developer apply for and win a $500,000 brownfield grant from the Wisconsin Economic Development Corporation, a practice that is as much an art as a science. Additional public support for the project was also received through tax incremental financing (TIF) and the Wisconsin Housing and Economic Development Authority (WHEDA) tax credits for low‐income housing.

“We merge our technical backgrounds to show the land has the potential to be turned into a strong asset that addresses the legacy environmental contamination, promotes public health, and delivers a high-value property that pays taxes and supports important city services,” says Tierney.

brownfield redevelopment
Madison Youth Arts Center

It takes technical horsepower to show regulators just how you are addressing contamination. You need to show the economic development group awarding the grant that the project will create well-paid jobs and tax revenue. Equally important, it must be shown that the redevelopment helps address a community need for affordable workforce housing and additional market-based housing,” Tierney says.

Tenants have already moved into the two 11-story mixed-use buildings. In addition, The Madison Youth Arts Center (MYAC) is slated to open in early summer, with a grand opening ceremony this fall. The MYAC includes classrooms, offices, rehearsal spaces, and a 300-seat auditorium.

The final project showcases the heartbeat of this popular downtown space situated between two large lakes, with features such as a rooftop terrace, plazas with seating and green space, and soon to come are 3D urban art installations and murals that tell the story of this long-lived community.

“The redevelopment of brownfields and the creation of projects like the Lyric and the Arden align with the City of Madison’s Performance Excellence Framework Vision of Our Madison – Inclusive, Innovate, and Thriving. These types of redevelopment projects help the City act as a responsible steward of our natural, economic, and fiscal resources. While making efficient use of land and cleaning up brownfields, the City is able to provide workforce housing, job opportunities, and cultural venues, all while enhancing the City’s tax base,” says Dan Rolfs, the Community Development Project Manager for the City of Madison’s Office of Real Estate Services – Economic Development Division.

It takes a village, or in this case – a City, to revitalize an urban brownfield!

 


 

Brownfields Resources to Organize, Educate, and Implement Plans in Your Community

 

 

 

 

 

 

Posted by Diane Samuels at 6:00 am

June 11, 2021

SCS hiring entry level field technicians

If you thrive in a friendly, collaborative, and client-focused company, SCS Engineers is the place for you. We’re looking for field technicians to work collaboratively on our Field Services teams nationwide. Specific information is posted for each open position. Use our job search to find your desired location.

Under general supervision, our technicians operate, monitor, and maintain gas migration control and recovery systems, including gas well monitoring and adjustment, troubleshooting, and system repairs.

 

Open Positions at SCS Engineers

 

Become one of the engineers, consultants, scientists, and technicians that help private and public entities run cleaner and more efficiently. A very rewarding place to have a career!

 

 

 

Posted by Diane Samuels at 6:00 am

June 10, 2021

brownfields redevelopment - SCS Engineers
See below for more brownfields resources to organize, educate, and implement plans in your community.

 

A Nebraska city earned an $800,000 grant from the Environmental Protection Agency. The City of Lincoln plans to use the grant to assess and clean up brownfield sites, including up to 10 acres of land city officials hope to use for self-sustaining urban agriculture projects.

Officials plan to create a self-sustaining urban agricultural area in two adjacent 5-acre parcels for lease by local farmers. Lincoln can begin moving local food production into commercial use by local businesses.

In a recent Journal Star article, Tim Rinne, chairman of the Lincoln-Lancaster County Food Policy Council, said, “Rather than continuing to rely exclusively on drought-stricken and wildfire-plagued California to produce the bulk of our produce, or waiting for the next breakdown of our national food distribution network like we saw with the COVID-19 crisis, Lincoln’s city government leadership is taking the visionary and cautionary step of building a resilient local food system.”

The planned agricultural use also helps protect surrounding developments. The five-year grant will help the city assess four other sites in the area and could support cleanup plans at two more sites.

 


 

Brownfields Resources to Organize, Educate, and Implement Plans in Your Community

 

 

 

 

 

Posted by Diane Samuels at 6:00 am

June 8, 2021

Landfill Operator
Shepherding in the 21st Century is a natural, sustainable way to keep landfill slopes groomed. While the sheep do the trimming, it is man and beast working together to make it successful.

 

Among the extensive list of landfill operating costs are those incurred for landscaping to keep the slopes trimmed. While regularly mowing large spaces is expensive, keeping sites well-groomed is essential for protecting landfill covers and providing other safeguards. Putting sheep and other grazing livestock to work eliminating invasive plants and other vegetation from properties difficult to traverse for two-legged workers could be a good alternative. Grazing is an often useful technique for maintaining traditional native plants while reducing weeds and unwanted vegetation, mitigating risk for growth to dry out and possibly catch fire or intrude on a site’s pipelines and infrastructure.

In municipal solid waste landfills near urban areas, such as in Pennsylvania, Arizona, and California, grazing animals are helping with slope management. These locations also reap environmental benefits of reduced soil erosion; improved air and water quality; better plant diversity, vigor and production; and improved wildlife habitat.

As with all landfill operations, planning is everything. The choice of grazing animal (i.e., sheep, goats, cattle, or horses) and the number of animals necessary is site-specific. To determine the best choices, SCS Engineers looks at site characteristics such as the age of the plants and the proportion of grass species present, the local climate, and wildlife species present.

A landfill operator in California using sheep to groom landfill slopes is pleased with the results after three months and plans to continue the grazing method in the upcoming years. “We use 400 sheep per acre, per day, and have 600 on-site.”

sheep grazing landfill
“We save the landfill 66 percent of its landscaping budget using a natural method.”

“We talked about it for years before we implemented this method,” he says. “We needed time to research the feasibility and the costs, but that isn’t a challenge for SCS; their environmental scientists have landfill expertise in gauging air, soil, water, inorganic and organic content. These are all conditions requiring careful consideration before bringing in sheep to graze.”

The operator was sold on grazing, seeing the environmental, economic, and safety benefits of this alternative to herbicides and staff maneuvering trimming equipment on steep slopes. Finding a shepherd was the next step. With all its benefits, the method does require human oversight.

Luis lives at the landfill in a trailer home, his base of operations. He grew up in Peru, herding sheep. The landfill operations staff trained him on landfill safety, and Luis, in turn, teaches landfill staff what to expect from the 600 sheep.

The herd grazes during daylight hours, clearing patches of mustard grass and weeds. “Sheep are a better choice than goats here; they are more selective and won’t eat native plants or damage the infrastructure by trying to eat it too,” says the landfill operator.

As the sheep graze on invasive grasses, they are preventing tumbleweeds and destroying the seeds while chewing. A further benefit is the fertilizer they leave behind supports the growth of native plants that require minimal grooming, are tolerant of dry conditions, and facilitate the protection of the landfill cover.

“Around here, where the climate is very dry, preventing tumbleweeds and flammable conditions is a priority. The herd is packing the groundcover down while they’re eating, providing a great alternative to mowing while helping control runoff,” says the operator.

The herd is low maintenance, thriving outdoors without shelter and needing only to have their water troughs filled. The shepherd has two helpers, a border collie for herding the sheep to new locations and another larger dog to help protect the sheep from coyotes. Both the dogs and the wildlife help cut down the number of burrowing animals, which for obvious reasons are not landfill-friendly.

Occasionally, the landfill operation staff helps Luis move the herd. He sets up new locations across the landfill as the sheep are grazing in another area. Then the dogs help move the herd to the new location. Keeping the sheep going in the right direction is hard work, explains SCS’s Regional Manager. “If one sheep breaks off, twenty more will follow. Depending on where we’re moving them, Luis may need extra hands.”

herd grazing steep landfill slopes
The herd shown grazing can easily climb steep landfill slopes.

This natural “landscaping” alternative with all its landfill-specific benefits is working well. The sheep can do some damage, they sometimes rub along exposed pipelines scratching themselves, but the staff is quickly alerted to anything broken. Luis uses a lightweight grid fence to corral the animals. The battery-powered fencing helps protect the sheep at night from coyotes with a light “shocking” deterrent, similar to static electricity. It’s enough to keep the carnivores at bay along with the dogs’ help.

The SCS landfill operations team has adopted the two dogs. Their Field Services Regional Manager points out, “We didn’t plan on adopting them, but we just couldn’t help ourselves. These are hardworking animals, and Guardian, the dog protecting the sheep at night, can get Foxtail, a grass-like weed, caught in his fur. The seeds can injure dogs, so we inspect and brush them, and we watch to ensure they stay healthy. These dogs, like the sheep, are part of the team and important to helping maintain the landfill − not to mention they’re special to us.”

The sheep, dogs, and Luis are doing an exemplary job. The operator expects in two or three seasons to see a significant improvement in maintenance; each consecutive year, there is less undesirable vegetation. “It’s working well; next year, we will start grazing in January to help prevent more invasive new growth earlier in the season,” he says.

“Environmentally, I like to think we’re helping our client be a good neighbor,” he continues. “And we save the landfill 66 percent of their landscaping budget every year; that helps us all sleep better.”

 


 

The U.S. Environmental Protection Agency recommends ecological restoration and revegetation of landfills, abandoned dumps, mines, and other site containment systems designed to protect people and the environment from exposure and prevent contaminant migration. Grazing is one cost-effective and efficient option to consider supporting these priorities.

Find more landfill engineering and operations information.

 

 

 

 

 

 

 

Posted by Diane Samuels at 6:00 am

June 3, 2021

Melissa Russo

 

When Melissa Russo’s boss Phil Carrillo told her he thought she should get her drone pilot license, she thought he was kidding. At the time, she worked on SCS’s Remote Control (RMC) team; selling drone services was a part of her job, but she had not thought of flying these unmanned vehicles herself.

Her thirst for competition kicked in when he turned the proposition into a bet. He was going after his pilot license himself; she bet she’d beat his score. They finished in a dead heat, but what started as friendly rivalry ended up bringing a new dimension to Russo’s job— a job that continues to expand in breadth as new opportunities turn up.

Today she not only flies, sells drone services, and teaches others how to sell and fly, but she’s helped bring geographical information systems (GIS) into RMC’s portfolio. How these technologies fit together is RMC remotely collects data from drones and different landfill systems. Then the GIS translates that data into maps, capturing a visual picture of how clients’ facilities’ systems are performing. The GIS piece is one of the latest chapters in the story of Russo’s evolving role (more to come on that).

 

Piloting is what especially gets her juices going.

Drone monitoring pipelines
Drone monitoring pipelines.

“I love working with my team, supporting them in what they do. But when it comes to drones, I like the hands-on experience of flying myself more than telling other people how to do it.”

She controls these small aircraft from a device on the ground, sharply focused on her surroundings while keeping the drone in her sight at all times.

“You have to make sure there are no manned vehicles around; they have the right of way. And there’s a lot of continuous movement on landfills. You’re constantly aware of your surroundings. Is a truck coming? Am I in line with where dumping is going on?”

 

Flying drones takes muscle and mechanical aptitude.

The drone and case can weigh 45 pounds. And there are a lot of moving parts to assemble and calibrate.

Sometimes it’s manual work, pointing and rotating a remote controller to send a radio signal to tell the drone what to do. But more often, she pilots automated flights that she maps in advance and uploads the flight path specs into software that interfaces with the drone.

“When I’m flying drones, I can access areas where if I had boots on the ground, I couldn’t. I can go and explore just about anywhere, similar to when I dream— only it’s real,” she says.

With any task, she’s laser-focused, concentrating on one part of the picture at a time to grasp the details. She steps back and uses critical thinking, accumulated knowledge, and imagination to take on what’s before her.

 

The innovation process

“We’re pretty lucky with our timing; new and proven technologies are emerging quickly. I’m one of many SCSers with a deep knowledge of technology and practical experience in the solid waste industry. Together, we can make a difference because we understand the business and operational challenges very well. When I need an expert in another industry, I just reach out to a colleague. The learning process never ends, and each project helps me and my team constantly find better answers.

“My boss is more of a big-picture person; his ideas are huge and amazing. He comes to me with new ideas, and I figure out how to make them work and implement them,” Russo says.

She points to his idea to use proven GIS technology within RMC. She was already using GIS to map methane data, process topographic maps, and stockpile calculations. For instance, she integrates methane values into the GIS and overlaps them with imagery so her clients can zoom in on one well or get a large-scale view of the overall health of the gas collection system. But integrating GIS in new ways to incorporate multiple landfill systems would solve some expensive problems and, better yet, prevent even more expensive mitigation and repairs.

 

Expanding GIS applications to illustrate multiple landfill systems

Examining multiple wellfield conditions
Examining multiple wellfield conditions, then zooming in on specific well metrics makes assigning field staff and technicians more efficient. See liquid levels, and many other conditions well by well, or in “hot” areas for LFG diagnosis.

“I know drones and how to process drone data. But now that we are expanding applications, I add more layers of landfill data, such as liquids, soil, the gas collection and control system (GCCS), SCADA, and surface emissions, to bring them into the RMC GIS platform. My colleagues are demonstrating these technologies at the SCS June Client Webinar.”

“I created a team of hand-picked SCS staff with both GIS and waste management backgrounds (and a whole lot of drive) to make the vision come to life,” she says. “That’s how we innovate, tight teams with access to nationwide expertise.”

Within six months of the project’s genesis, Russo and her team had integrated gas and liquid collection systems, other landfill systems, and asset management into the RMC GIS platform. She and her team now sell these applications nationwide.

 

Russo’s come a long way since joining SCS at age 21

In her mind, she grew up at the company. Before coming on board, she managed a shop in Manhattan Beach, California, while she began thinking about what to do next.

“I learned a lot about business and people. It was a stepping-stone – I discovered how to earn trust, build rapport, and sell. But in time, I decided I wanted a more professional job,” she recalls.

She went to work for a real estate company managing the SCS Engineers Long Beach office, where she would soon take an entry-level Accounts Payable position in SCS Field Services.

In time, she transitioned to the Health and Safety group, assisting in creating training material and managing truck fleets. Soon she was managing assets, among other firsts for her. By this point, she had developed enough software, accounting, and other administrative skills to step up fast.

Part of the job was keeping up with vehicle maintenance, so she often spoke with field staff. Many of them she already knew from her days working in the accounting department.

 

Growing with her SCS colleagues

“When I was in my first administrative roles, I supported many colleagues who were field techs or supervisors; they are project managers now. It feels as though we’ve grown up together, and we know and trust each other. We collaborate well and know that when we bring projects to each other that we will take care of each other,” Russo says.

She especially likes the RMC concept because remote control and automation enable her, her clients, and her team to work smarter, not harder because they leverage the technology to work for them.

“That means we can usually work from anywhere, giving all of us more time for family, friends, or allocating the time saved towards other needed to-dos. I’m up at five a.m. and, at times, may not finish work until nine at night. Somehow, us working women find the balance in between meetings, writing proposals, and answering emails; I have lunch with my two boys or take them to a park,” she says.

Bambi Lance, a veteran SCSer and her mother, works in the same business unit as Melissa does. “Mom’s been here for 16 years, and it’s interesting to have her perspective not only as my mom but as someone who knows SCS. She knows my department, and she knows me. She sees what I am doing and she along with management encourage me to do more and believe in myself.”

Russo reflects again on the concept of stepping-stones on the way to knowledge and maturity. I’m competitive and take on challenges, which has been a driving force in all I do today. It’s helped me take a personal inventory of how I am now versus the young Melissa,” she says.

She uses it to gauge her direction. And she uses it to connect to her staff. “I try to help them see you can turn almost any experience, into a positive. I want my team to see we are all learning and growing. They can, as I can, comfortably bring new ideas to the group and company, which often turn into new ways to help clients.”

She circles back to her decision to fly drones, explaining how it aligns with her career path from her first steps to today. “Becoming a pilot was a natural fit because it’s a new challenge. The craving to take on new tasks is how I grew from an accounting administrator to a project coordinator up to a business manager. It’s wanting to expand my knowledge, tackle new feats, and accomplish what I was not sure I could do. I like the challenge.”

 

More videos and information.

The SCS Culture is Driven by Client Success

 

 

 

 

 

Posted by Diane Samuels at 3:15 pm

June 2, 2021

remediation boundaries

Join SCS on June 10 for another client webinar. Using case studies, we show you how our clients tackle common challenges using proven GIS technology to reduce expenses and run more productively.

 

Property Development: Time is money on development projects. Environmental engineers use GIS to more accurately pinpoint potential contamination sources, conduct site assessments, strategize remediation solutions, and see sampling results weeks faster. Infographics and dashboards show if and exactly where to continue sampling without waiting weeks or months for reports.

Landfills: Operators make diagnostic and forensic use of GIS to address maintenance tasks faster. We’ll cover modeling 3D wells and liquid level data, showing how GIS embedded dashboards and infographics pinpoint exactly where to assign staff. At the same time, supervisors monitor completed assignments seeing real-time results and what still needs attention.

Siting Solid Waste Facilities: Decision-makers use multi-criteria decision analysis incorporated into a geographic information system to account for relevant technical data, environmental, social, and economic factors during the site selection of a waste transfer station. The resulting maps and infographics are useful at public meetings too.

 

 

 

 

 

 

Posted by Diane Samuels at 6:00 am

June 1, 2021

epa rmp

 

May 27, 2021, from two separate U.S. Environmental Protection Agency (EPA) announcements:

EPA intends to reconsider and revise the 2020 CWA Section 401 Certification Rule

Congress provided authority to states and Tribes under CWA Section 401 to protect the quality of their waters from adverse impacts resulting from federally licensed or permitted projects. Under Section 401, a federal agency may not issue a license or permit to conduct any activity that may result in any discharge into navigable waters unless the affected state or Tribe certifies that the discharge is in compliance with the Clean Water Act and state law, or waives certification.

EPA intends to reconsider and revise the 2020 CWA Section 401 Certification Rule to restore the balance of state, Tribal, and federal authorities while retaining elements that support efficient and effective implementation of Section 401. While EPA engages with stakeholders and develops a revised rule, the 2020 rule will remain in place. The agency will continue listening to states and Tribes about their concerns with implementing the 2020 rule to evaluate potential administrative approaches to help address these near-term challenges.

The agency’s process of reconsidering and revising the 2020 CWA Section 401 Certification Rule will provide an opportunity for public and stakeholder input to inform the development of a proposed regulation, and will include sustained dialogue with state and Tribal co-regulator partners and local governments around these issues. EPA will begin a stakeholder engagement process in June to hear perspectives on this topic and how to move forward. More information will be available at: www.epa.gov/cwa-401.

 

EPA, Region 7, public listening sessions on the RMP Rule

Section 112(r) of the Clean Air Act Amendments requires EPA to publish regulations and guidance for chemical accident prevention at facilities that use certain hazardous substances. These regulations and guidance are in the Risk Management Plan (RMP) rule, which requires facilities using extremely hazardous substances to develop a Risk Management Plan that:

  • identifies the potential effects of a chemical accident,
  • identifies steps the facility is taking to prevent an accident, and
  • spells out emergency response procedures should an accident occur.

These plans provide information to local fire, police, and emergency response personnel to prepare for and respond to chemical emergencies in their community.

The Region 7 EPA announced two upcoming virtual public listening sessions on the Agency’s Risk Management Plan (RMP) rule. The RMP rule has been identified as an action for review under Executive Order 13990: Protecting Public Health and the Environment and Restoring Science To Tackle the Climate Crisis.

The listening sessions will give people the opportunity to present information, and provide comments or views pertaining to revisions made to the RMP rule since 2017. The Occupational Safety and Health Administration (OSHA) will also participate in the listening sessions and receive comments on their Process Safety Management (PSM) standard, which contains similar requirements to the RMP rule.

Virtual public listening sessions will be held on:

  • June 16, 2021, from 12:00 p.m. to 4:00 p.m. ET.
  • July 8, 2021, from 4:00 p.m. to 8:00 p.m. ET.

For more information on the public listening sessions:

https://www.epa.gov/rmp/forms/virtual-public-listening-sessions-risk-management-program-rule.

Submit written comments via the docket at: http://www.regulations.gov,  Docket ID: EPA-HQ-OLEM-2021-0312 until July 15, 2021.

EPA Region 7 serves Iowa, Kansas, Missouri, Nebraska, and Nine Tribal Nations.

 

 

 

 

 

 

 

 

Posted by Diane Samuels at 11:17 am

May 27, 2021

odor sources on landfills

 

All landfills regulated under the NESHAP air program must comply with updated federal regulations by September 2021, including new requirements for landfill gas beneficial use treatment systems and gas system design plans. Additionally, the EPA is finalizing a federal plan implementing new NSPS air rules for landfills modified or constructed before July 2014, and not yet covered under an approved state plan.

At the state level, as part of a continued focus on greenhouse gas (GHG) reduction, Maryland MDE is expected to publish new regulations this year addressing landfill methane control.

Jacob ShepherdJacob Shepherd, P.E., will cover what landfills need to do to comply with the updated federal regulations and will discuss anticipated new requirements under the MDE regulatory initiative as an example of the direction states are moving.

This discussion takes place at REVISION 2021, an online conference.

For additional information, see our recent blog: Regulatory Alert: MSW Landfills Federal Plan to Implement the Emission Guidelines (EG) and Compliance Times.

 

 

 

 

 

 

Posted by Diane Samuels at 6:00 am
SCS Address

Corporate Headquarters

SCS Engineers
3900 Kilroy Airport Way Suite 300
Long Beach, CA 90806
FAX: 1 (562) 427-0805

Contact Us

Required Posting
Send us a message
×