SCS Energy Case Studies
December 14, 2020
SCS Energy: Landfill Methane to Renewable Natural Gas, 5.1 Million Gas Gallon Equivalents of RNG Annually
The New River RNG facility will capture and convert approximately 1,900 dekatherms per day of landfill methane to renewable natural gas (RNG), which is enough to offset emissions from 7,500 … Continue reading SCS Energy: Landfill Methane to Renewable Natural Gas, 5.1 Million Gas Gallon Equivalents ...
November 16, 2018
SCS Energy: Multiple Dairy Digester Gas to RNG Plants in California
CalBio Dairy DG to RNG Plants SCS is designing three dairy digester gas to renewable natural gas (DG-to-RNG) plants in California’s Central Valley. The projects are sized at 1,500 scfm, 1,500 … Continue reading SCS Energy: Multiple Dairy Digester Gas to RNG Plants in California
November 16, 2018
SCS Energy: Dairy Digester Gas to Renewable Natural Gas in Texas
Digester Gas Utilization Plant – Confidential Client SCS designed and currently operates a 2,900 scfm dairy digester gas to renewable natural gas (DG-to-RNG) plant in Texas. The product gas capacity … Continue reading SCS Energy: Dairy Digester Gas to Renewable Natural Gas in Texas
November 16, 2018
SCS Energy: CALGREN Digester Gas Utilization to RNG Using Dairy Feedstock
CALGREN Digester Gas Utilization SCS designed a 2,500 scfm dairy digester gas to a renewable natural gas (DG-to-RNG) plant in Pixley, California. The product gas capacity is 2,100 MMBtu/day. SCS … Continue reading SCS Energy: CALGREN Digester Gas Utilization to RNG Using Dairy Feedstock
November 16, 2018
SCS Energy: LFG to Pipeline RNG Plant in Texas
Skyline RNG Project SCS is designing a 5,000 scfm inlet capacity LFG-to-pipeline renewable natural gas (RNG) plant, located at the Skyline Landfill in Ferris, Texas. SCS will also provide assistance … Continue reading SCS Energy: LFG to Pipeline RNG Plant in Texas
November 16, 2018
SCS Energy: Outer Loop LFG to Pipeline RNG Plant
Outer Loop RNG Project – Confidential Client SCS, responsible for the design of this 5,000 scfm inlet capacity LFG-to-pipeline RNG plant which began commercial operation in March 2018. The product gas … Continue reading SCS Energy: Outer Loop LFG to Pipeline RNG Plant
November 15, 2018
SCS Energy: LFG to RNG Design-Build in Indiana
Southside RNG Plant SCS is designing and constructing a 4,000 scfm LFG to RNG plant in Indianapolis, Indiana. The product gas capacity is 2,710 MMBtu/day. The RNG plant will begin … Continue reading SCS Energy: LFG to RNG Design-Build in Indiana
November 15, 2018
SCS Energy: Digester Gas to RNG Design-Build in Iowa
AgPower Jerome RNG Plant SCS is designing and constructing a 1,400 scfm DG-to-RNG plant in Jerome, Idaho. The RNG plant will employ the following technologies: DG booster blower skid, with … Continue reading SCS Energy: Digester Gas to RNG Design-Build in Iowa
November 15, 2018
SCS Energy: Design-Build-Operate LFG to RNG Plant in Florida
Volusia RNG Plant SCS is engaged as the engineer/constructor/operator for a 2,300 scfm LFG-to-RNG plant at the Tomoka Farms Landfill in Volusia County, Florida. SCS is preparing the conceptual design. … Continue reading SCS Energy: Design-Build-Operate LFG to RNG Plant in Florida
November 15, 2018
SCS Energy: Design-Build-Operate LFG to RNG Plant in San Bernardino
Mid-Valley RNG Plant SCS is engaged as the engineer/constructor/operator for a 4,200 scfm LFG to RNG plant at the Mid-Valley Landfill in San Bernardino County, California. SCS is currently preparing the … Continue reading SCS Energy: Design-Build-Operate LFG to RNG Plant in San Bernardino