Outer Loop RNG Project – Confidential Client SCS, responsible for the design of this 5,000 scfm inlet capacity LFG-to-pipeline RNG plant which began commercial operation in March 2018. The product gas … Continue reading SCS Energy: Outer Loop LFG to Pipeline RNG Plant
Southside RNG Plant SCS is designing and constructing a 4,000 scfm LFG to RNG plant in Indianapolis, Indiana. The product gas capacity is 2,710 MMBtu/day. The RNG plant will begin … Continue reading SCS Energy: LFG to RNG Design-Build in Indiana
AgPower Jerome RNG Plant SCS is designing and constructing a 1,400 scfm DG-to-RNG plant in Jerome, Idaho. The RNG plant will employ the following technologies: DG booster blower skid, with … Continue reading SCS Energy: Digester Gas to RNG Design-Build in Iowa
Volusia RNG Plant SCS is engaged as the engineer/constructor/operator for a 2,300 scfm LFG-to-RNG plant at the Tomoka Farms Landfill in Volusia County, Florida. SCS is preparing the conceptual design. … Continue reading SCS Energy: Design-Build-Operate LFG to RNG Plant in Florida
Mid-Valley RNG Plant SCS is engaged as the engineer/constructor/operator for a 4,200 scfm LFG to RNG plant at the Mid-Valley Landfill in San Bernardino County, California. SCS is currently preparing the … Continue reading SCS Energy: Design-Build-Operate LFG to RNG Plant in San Bernardino
UC Shreveport Biomethane Facility The University of California (UC) Shreveport RNG Facility consists of an RNG plant, located at the Woolworth Road Landfill in Shreveport, Louisiana, which converts LFG into … Continue reading SCS Energy: LFG to RNG Pipeline Facility at the University of California
Berkeley County Solid Waste Management Facility, Moncks Corner, SC Click to view the video photo gallery. Background The Berkeley County Solid Waste Management Facility includes an active municipal solid waste and … Continue reading Landfill Partial Closure with Alternative Cover
Recycling volumes are growing quickly, and are on track to grow to 60,000 tons of material diverted from the landfill. DCPW is saving $600,000 per year by not having to … Continue reading Solid Waste Planning: Dane County Construction & Demolition Recycling Partnership, Rodefeld Landfill, Madison, ...
Engineering Design and CQA for an Aerated Static Pile – Composting Facility under the Queensboro Bridge, New York City, NY Background The NYC Compost Project Hosted by Big Reuse is … Continue reading NYC Compost Project – Big Reuse – New York City Department of ...
SCS Tracer Environmental, a division of SCS Engineers, started working with the City of Escondido during the design phase of their new bulk chlorine water treatment plant in June 1992. … Continue reading Environmental Management Planning – Water Treatment Facility, CA